Saturday, 25 August 2012

Shipping

All

Friday 24th August.

The bike shipped on the 21st August and i left 2 days later to meet and collect the bike the other end.

It has been shipped direct to Woodstock Harley Davidson in NY.

If you are local to this area, please feel free to drop in to the dealership and say hi.

For those of you who have seen Brian Dawars film "White Knuckle" which outlines the 2010 Cannonball run will have seen Bill Nugent.

Bill competed in the 2010 Cannonball run on his 1913 Sears and this is proudly displayed at Woodstock Harley Davidson.

Bill has been a perfect host while we all await the logistic to finalise and our bike to be delivered.

The plan was to have the bike arrive a few days before i arrived, however this has not eventuated, and hence i am wondering around awaiting our the delivery.

The good news is that the bike is in the right country, and is in transit.

I trust that it will arrive on Monday and we can commence re-assembly.

I don't have a camera , and am travelling so am unable to load any photos for anyone.
We have picked up a Us phone so if anyone would like to contact us, please email us for the number.





Thursday, 23 August 2012

Tanks a lot

It was decided to spruce the Invincible Jap up with new tanks and also a tool box.

The main reason was for reliability.
Although the original tanks held fuel the 4000 miles across the USA would certainly have tested them.

The tanks wer made by John who specialises in producing reproduction fuel tanks.

I can honestly say that the service and professionalism of John was far beyond our expectations and these were promptly produced and delivered in a record time.


They functionality and special requests were taken in to account and for once the job was done on time (in fact under time) and below the budget.

As this bike is being built for a specific purpose it was decided to increase the oil tank and fuel capacity slightly and this was done by increasing the width by 3/4" overall.

It is not noticeable, and increases the capacity of both the fuel and oil to a practical level.
In fact Invincible offered this width on the sports models.
The tanks were fully welded (TIG) and pressure tested before being delivered.

There was minor felting and finishing required, however the tanks were painted without any filled and are real testament to John's ability to deliver quality work on time.

My pal actually commented that it took more work to surface coat the tanks that it did to make them.

While i don't know if this true, it did take some time to get the pin stripes and decals on.

I cant wait to get these back on to the old Girl and see how they present.

The tanks were clear coated by Stan Muncha at Melbourne Dustings Sidecars.
Stan specialises in period correct dusting's sidecars and has over 50 yrs experience within the repair and restoration of vehicles .


















Photo shoot

All

With a planned  shipping date drawing closer than close it was decided  that we should  get  a photo shoot of the bike prior to departing.

We rode the Invicible Jap  around for 30 mins prior to loading this in to the truck for delivery to the photo shoot.

The bike is running well, some minor issues with oil and gearing, however this is basically as we will be at the start, providing all is recieved with the shipping.


Phil Smith has been involved in motorcycles for many years and we had  agreed to a shoot prior to our departure.

For those of you who are local we can thoroughly recommend Phil's Professionalism , patience and dedication to his art.

Our team was all suitable impressed with the quality and the fact that each picture was brilliant.
I have only posted a few, but there are many more.

If you are interested in contacting Phil you can find his details on

http://photosmith.com.au/











Sunday, 19 August 2012

1925 Jap takes to the Road U tube Overview



All

The event start draws near, we are still in Australia three weeks from the start.

Much still has to happen.

We are pleased to anounce that shipping is arranged and the bike has been running strong.


The bike departs early next week, via Air, and is being delivered to Woodstock Harley Davidson in New York.   Bill Nugent  who rode a 1913 Sears in Cannonball 2010 will be there to help us sort out the logistics and re-assembley of our machine.

http://www.youtube.com/watch?v=Wdkt1_Y6V7M

Invincible JAP Cannonball 2012 entrant #16

Alert icon



We have had many people drop over to view and see this over the last few weeks.
Steve Martin from the Newport Folk and Fiddle CLub managed to shoot a quick u-tube clip.

Please take the time to view this, as it says much more than a few pics.

We are all looking forward to the start line and catching  up with old and new pals.






Tuesday, 14 August 2012

Quite time (exhaust)



We needed to quieten the Invincible Jap down.

There was little chance that the current exhaust system would go UN-noticed in the USA so we decided to build a muffler.

A good pal was tasked with this and the photos below show the basic steps.


It was decided to fit an original style Invincible Jap muffler (Similar to a J Harley) but turn this 90 degrees on its side, as this was really the only place we could locate it.


To keep with the style of the period, we pressed the JAP logo into the front of the muffler.
I must say that i was a little hesitant at this, as i thought it might be a little over kill, but it certainly does not look out of place.

The machine used is a Power hammer, and these are really cool machines to use.
They have a fixed anvil on which a movable hammer oscillates about 3500 / Min and this stretches or shrinks the metal.

They are a use full tool for sheet metal construction and anyone skilled enough to master this machine is always in demand.


The photos show the construction better than words.

Once this muffler was fitted the slip in tail pipe can be moved laterally to set the back pressure and obtain the required note on the bike.
It has gone from a high noise to a deep dull Boooob de da Boooom, Boooom de da etc.



It actually sounds quite neat.

The finished result is a neat custom muffler that certainly doesn't look like and afterthought.


More importantly it actually works better than anticipated, with the period appeal and can be altered to tune quite easily.......

I hope that those reading this Blog can take note of the muffler when they view this machine.